Line items and the top sheet
Estimated total = quantity × unit cost × multiplier, plus the allowance percentage. The top sheet is those totals by department. Suggestions read your actual project rather than a generic template.
The columns
| Column | What it does |
|---|---|
| Description | What is being paid for. |
| Quantity | How many units: days, weeks, people, items. |
| Unit | What a unit is: day, week, hour, flat, or item. Changes nothing arithmetically; changes everything about whether the line is readable. |
| Unit cost | The rate per unit. |
| Multiplier | A factor applied on top, for partial periods or a rate that scales. Defaults to 1. |
| Allow % | A per-line contingency. Better than one lump sum at the bottom, because it records which lines you were unsure about. |
| Estimated total | Computed. Quantity × unit cost × multiplier, plus the allowance. |
| Actual | What it really cost. Left blank until you know. |
| Notes | The quote reference, who gave it, what it excludes. |
The top sheet
The top sheet is every department’s total and the figure they sum to. It is the one page a financier reads. It sits above the detail so you can see the shape of the budget without scrolling through 200 lines.
The shoot day count shown alongside comes from the schedule board, and it’s the number several suggestions are calculated from. If the schedule is empty, that figure is zero and the suggestions will be poor.
Smart suggestions
Suggestions read what is actually in your project and propose line items that follow from it: how many shoot days the schedule has, how many cast are in the scene list, how many locations, what the breakdown says you need. A production with a stunt in the breakdown gets a stunt coordinator suggested; one without doesn’t.
They’re proposals: accept, edit or ignore each. Most useful late, as a completeness check. The question at that stage is what you have forgotten, not what to write down first.
Export produces a PDF by department. To move numbers into other software, the Data tab’s project export carries the budget as structured JSON.